Kalamazoo Security Print
Kalamazoo Security Print recently selected KEE to install a waste extraction system at their new factory in Redditch.
15 years ago, KEE installed an extensive system for their original factory in Longbridge, West Midlands.
After experiencing the benefits of a KEE system for this period of time, there was only one choice of supplier when Kalamazoo relocated.
KEE installed a new system with over 25 waste extraction points throughout an extensive factory.
The system included a large chopping fan, static screen waste separator & balance fans.
An additional smaller system was installed to serve a security shredder, which incorporated a smaller chopping fan, pod type waste separator and dust filter.
The systems were installed and commissioned over a four week period.